- Jobs
- United Kingdom
- Slough
- construction programme supervisor
construction programme supervisor jobs in Slough
CSA Supervisor – Data Centre Sector: Data Centre Construction Contract: 6+ Months Contract Immediate Start We are currently seeking an experienced CSA Supervisor to join a major data centre project based in Slough. This is an excellent opportunity to work on a high-profile, technically complex facility within a fast-growing sector. Supervise and coordinate all CSA works on site, ensuring delivery...
Project Manager (Mechanical) - London Location: London Contract Length: 12 months+ Rate: DOE (Outside IR35) Working Arrangement: On site / office About the Role: g2 are seeking a Mechanical Project Manager to lead projects in London. Responsible for overseeing and managing all aspects of a number of different projects at one time. The role is a 12-month+ contract with the potential for...
You will be an experienced insurance professional with a qualified background in Real Estate and Construction insurance, comfortable handling sophisticated client requirements and operating in a senior advisory capacity.
You will likely bring: - Proven experience managing large, complex real estate and/or construction insurance programmes
Accounts Supervisor - London Reporting to the Head of Accounts, the Accounts Supervisor will be responsible for the day-to-day activities of the Accounts team in ensuring the overall provision of an accurate, efficient and timely accounting and cashiering service to all six of our offices (Bristol, London, Glasgow, Dubai, Canada and Dublin). About Beale & Co Beale & Co provides specialist...
Main activity : The Tod's Supervisor works under the direction of the Store Manager. The Supervisor implements all necessary assigned functions. Supervisor participates in generating sales and bringing in revenue for the company. This job requires a blend of skill, competency and immense dedication. They are often required to attend different types of training programs (sales, collections,...
You will lead and support teams delivering refuse and recycling collections across the borough, ensuring compliance with legislation and meeting customer expectations. This vacancy is for a full-time position, working 5 days per week.
Engineering Supervisor - Data Centre This role provides assistance and support to the Senior Buildings Manager in the coordination and delivery of core buildings related services for staff and clients. Ensuring that the works being carried out by the client / contractor is to the specified standard and to report on maintenance performance and the condition of buildings services. - have...
Store Supervisor - Charing Cross Industry: Designer collectible pieces Location: Charing Cross, WC2H 0NE Job type: Full time, Permanent About POP MART POP MART (09992.HK) is a leading global company in the trend culture and entertainment industry. Centered around IP, POP MART has built a comprehensive platform for creative incubation and IP operation, empowering global creators while...
You will ensure all water systems are operated and maintained in line with ACOP , while managing PPM and reactive works and maintaining audit ready documentation. Key Responsibilities - Lead all cooling tower operations, ensuring statutory compliance, monitoring, sampling, cleaning, disinfection, and chemical control.
You will need to have a good understanding of building maintenance, compliance testing, retail refurbishment, contractor management and ensure all shops in your area are fit for purpose, well maintained and support the operational needs of the business.
You will be responsible for maintaining various water assets, including:
Job Description Skillset: Tunnelling/TBM/Engineering/Surveying. Job location: Victoria Road / North Acton. Accessible by public transport? Yes (North Acton). Working hours: 24/7 12hr during OOC Tunnels Construction - shift rota TBC Role SCL Shift Engineer for OOC SCL tunnels. Responsible for the SCL works on site, taking a significant role in delivery as well as managing aspects of time, cost...
You will manage electrical subcontractors, programme, procurement, quality and safety, ensuring works are delivered safely, to specification, on programme and within budget.
You will also receive a significant civil service pension with 28.97% contribution by the employer annually as part of your package. Your annual leave will be 28 days + bank holidays rising to 33 day after 5 years of service.
You will have 14 Supervisors reporting into you, with overall responsibility for the performance and wellbeing of approximately 40 delivery operatives working across the framework.
You will be a confident and capable people manager, able to motivate teams, manage performance and address issues constructively.
You will be heavily invested in by being trained extensively, with a view to establishing a long-term future career as a valued member of this company.
You will be responsible for a variety of interesting work, largely based outside, a good deal of which will involve travelling to various customer sites to carry out the removal of invasive plants.
We are recruiting for an experienced Site Based Project Manager to lead a large commercial new build scheme in Slough valued at £25m +. This role is with a well-established main contractor delivering high-quality projects across the region.The Project Manager will take full responsibility for day-to-day site operations, ensuring works are delivered safely, on programme, and to the required...
You will assist in planning, scheduling, budgeting, and coordinating subcontractors, ensuring safety, quality, and timely delivery. Key Responsibilities: Support the management of steel works packages during preconstruction and construction phases. Assist in reviewing drawings, specifications, and technical documentation for accuracy.
Job Description About The Role Right across infrastructure, theres a requirement to not only maintain, but also renew and reimagine. Whatever stage youre at in your career, with us youll have an opportunity to grow and develop. Delivering essential infrastructure services for life, while being safety first, and client and customer centric in a friendly, fun and respectful environment where you...
CSA Supervisor – Data Centre Location: Slough, Berkshire UK Sector: Data Centre Construction Contract: 6+ Months Contract Immediate Start We are currently seeking an experienced CSA Supervisor to join a major data centre project based in Slough. This is an excellent opportunity to work on a high-profile, technically complex facility within a fast-growing sector. Key Responsibilities -...