construction programme supervisor jobs in Aberdeenshire

Jobs found: 31
Bookmark Not interested
BREEDON GROUP LIMITED
Inverurie

You will conduct routine maintenance, diagnosing mechanical faults, and implementing preventative and corrective maintenance programs to minimise downtime and optimise performance. Key Responsibilities Perform routine maintenance, inspections, and repairs on mechanical equipment, machinery, and systems

a day ago
Bookmark Not interested
Cera Care
Ellon

Position: Field Care Supervisor Reporting to: Registered Manager Contract Type: Permanent, Full Time, 37.5hrs Salary: £27,000 per annum About the role: We are looking for a passionate Field Care Supervisor to become an ambassador for Cera and an extension of our family. You'll carry out initial introductions, construct care plans, conduct client assessments, and shadow Care Workers to...

6 days ago
Bookmark Not interested
Pontoon
Peterhead

Join Our Team as a Gas Terminal Operations Supervisor! Are you ready to take the next step in your career within a dynamic and safety-focused environment? Our client is seeking a passionate and skilled Gas Terminal Operations Supervisor to support their operations at St Fergus. This exciting 6‐month contract (with the potential for extension) offers a competitive hourly rate through Umbrella or...

4 hours ago
Bookmark Not interested
MacGregor Industrial Supplies Ltd
Inverurie

We're looking for a practical, hands‐on Workshop Supervisor to support the day‐to‐day running of our Agricultural, Construction and Ground Care workshop in Inverurie. This role suits someone who takes real pride in their work, has a strong work ethic, and leads by example on the workshop floor. You'll be passionate about doing the job properly, supporting your team, and delivering a reliable,...

4 hours ago
Omexom UK
Kintore

Electrical Site Supervisor – Job Description Job Details Job Title: Electrical Site Supervisor Reporting to: Site Manager Business Unit: MPN – Kintore Phase 3 Purpose of the Position The Electrical Site Supervisor will undertake the site supervision of all Electrical Installation works. This work will be undertaken in full compliance with the construction drawings, documents and...

4 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven
£50,000

Building a sustainable tomorrow Were looking for an enthusiastic and motivated Site Engineer to join our friendly - Eastern Green Link 2 (EGL2) project team in Peterhead, Scotland. EGL2 is a 525kV, 2GW high voltage direct current (HVDC) subsea and underground onshore transmission cable from Peterhead, in Aberdeenshire, to Drax, in North Yorkshire with 2 no. HVDC convertor stations constructed at...

4 hours ago
Bookmark Not interested
Ceto Talent
Inverurie

🌍 Marine Assurance Manager – Offshore Vessels 📍 Office in Aberdeen | Hybrid working 💰 Competitive Basic Salary + Benefits ⏱️ Full time / Up to 50% travel / Hybrid split between office and home Ceto Talent is supporting a European ship-management and vessel operations company with headquarters in Germany and offices across the UK and Poland. The business owns and manages a fleet of offshore...

Hybrid
2 days ago
Stryker
Aberdeenshire

Description Product Support Specialist - Manual & Robotic - North East Scotland, Aberdeen (12 month fixed term contract - MAT Leave cover) Position Summary: To grow Stryker's Joint Replacement business by promoting Hip and Knee products to Orthopaedic Surgeons and optimizing customer service, growing existing accounts through technical expertise. The Product Support Specialist – Manual &...

6 days ago
Bookmark Not interested
Motive Offshore Group
Westhill

You will join a highly skilled and dedicated team that prides itself on delivering top‐quality work and consistently exceeding expectations. This is a team that is used to working with meticulous attention to detail and meeting high standards.

4 hours ago
Bookmark Not interested
Deanston Cooper
Peterhead
£65,000 – £75,000

Deanston Cooper's client, is a leading national civil engineering contractor operating across Scotland. Due to increased workload they have a current requirement for a Senior Engineer with previous concrete experience to work on a £10 million substation project in Peterhead. Future projects are expected in this area and accommodation can be provided.Your duties as Senior Engineer will include: *...

4 hours ago
Deeside Timberframe Ltd
Stonehaven

Overview Deeside Timberframe is one of the UK's leading timberframe design, manufacture and installation companies. Due to the expansion of our Stonehaven manufacturing facility, we are recruiting for Panel Fabricators / Trainee Panel Fabricators to join our expanding team. Deeside Timberframe is part of the Bancon Group, which also encompasses Bancon Homes and Bancon Construction. The Group...

No Experience
4 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow We have an exciting opportunity for a Section Engineer to join our team on the Eastern Green Link 2 (EGL2) project in Peterhead, Scotland. The EGL2 project is a landmark development in the UKs transition to renewable energy. It involves the creation of a 525kV, 2GW high-voltage direct current (HVDC) subsea transmission cable, connecting Peterhead, Scotland, to...

4 hours ago
Bookmark Not interested
BREEDON GROUP LIMITED
Inverurie

About Breedon Group: Breedon Group plc is a leading vertically integrated construction materials group in Great Britain, Ireland, and the USA. We're dedicated to providing high-quality materials and services for the construction industry, with a commitment to safety, sustainability, and innovation. Joining Breedon means becoming part of a team that values excellence and is committed to making a...

16 hours ago
Bookmark Not interested
Deanston Cooper
Peterhead
£55,000 – £65,000

Deanston Cooper's client, a highly successful national civil engineering contractor with a large order book, have a current requirement for a Site Engineer. Projects include commercial groundworks and concrete structures for a variety of interesting building & civil engineering projects in the Peterhead area. Accommodation can be provided if required.Your duties as Site Engineer will include: *...

4 hours ago
MacGregor Industrial Supplies Ltd
Inverurie

A leading workshop solutions provider in Inverurie is seeking a Workshop Supervisor to oversee daily operations in their Agricultural, Construction, and Ground Care workshop. The ideal candidate will have supervisory experience, a passion for the industry, and a strong work ethic. Responsibilities include coordinating technician workloads, ensuring high standards, and supporting team development....

4 hours ago
Create job alert for new jobs for
construction programme supervisor, Aberdeenshire
Bookmark Not interested
BREEDON GROUP LIMITED
Inverurie

As a Quarry Fitter based at Daviot Quarry in the Highlands Region, you will enjoy working in a ‘hands on’ practical position within a busy environment alongside a close-knit group of colleagues supporting support the existing team in maintaining and repairing of the plant. You’re not someone who likes to sit back and let others do the work for you; the more proactive you are in this role, the...

16 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven
£50,000

Building a sustainable tomorrow Were looking for an enthusiastic and motivated Site Engineer to join our friendly - Eastern Green Link 2 (EGL2) project team in Peterhead, Scotland. EGL2 is a 525kV, 2GW high voltage direct current (HVDC) subsea and underground onshore transmission cable from Peterhead, in Aberdeenshire, to Drax, in North Yorkshire with 2 no. HVDC convertor stations constructed at...

3 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow We have an exciting opportunity for a Section Engineer to join our team on the Eastern Green Link 2 (EGL2) project in Peterhead, Scotland. The EGL2 project is a landmark development in the UKs transition to renewable energy. It involves the creation of a 525kV, 2GW high-voltage direct current (HVDC) subsea transmission cable, connecting Peterhead, Scotland, to...

3 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow BAM Infrastructure have an opportunity for an Agent to join our team on the Eastern Green Link 2 project (EGL2) in Peterhead, Scotland. The Eastern Green Link 2 (EGL2) project will see the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. BAM Infrastructure will provide the...

3 hours ago
Bookmark Not interested
BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow BAM Infrastructure have an opportunity for an Agent to join our team on the Eastern Green Link 2 project (EGL2) in Peterhead, Scotland. The Eastern Green Link 2 (EGL2) project will see the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. BAM Infrastructure will provide the...

a day ago
Menu