- Jobs
- United Kingdom
- Helensburgh
- construction programme supervisor
construction programme supervisor jobs in Helensburgh
Programme title: Quantity Surveying and Construction Management Graduate Programme Salary: Minimum £35,. Salary is dependent on location, role and qualifications. Location: HM Naval Base Clyde, Scotland Application closing date: 11th December Programme start date: September Role ID: What will you do on the programme? If you’re looking for a career where no two days are the same, our...
RBA Production Supervisor (Database Management) Location: Coulport, near Helensburgh (Scotland - 20 minutes north of Helensburgh) Package: Starting from 40,000 (Dependant on experience and suitability for the role) Working pattern: Monday - Thursday (core hours) with opportunity to increase earnings through shifts and overtime, which will include occasional weekend working and shifts over...
You will work collaboratively to ensure the construction activities are delivered to the highest quality and safety standards.
You will need your own transport and must be prepared to travel to site 5 days. The client site is in the Argyll and Bute area. Security Requirements
A global consultancy is seeking experienced Programme Directors to join its expanding team delivering major infrastructure programmes across sectors including civil infrastructure, data centres, defence, and energy. These specific permanent roles are available on a hybrid basis and will focus on huge infrastructure projects in the defence and nuclear sectors, working in partnership with clients...
Part of the VolkerWessels UK Group, VolkerStevin is an industry-leading civil engineering business, providing complex and innovative engineering solutions across a wide range of sectors including maritime, flood risk management, defence, energy, water and regeneration. Collaborating with, and drawing on the specialist skills of the group's business units we deliver a truly integrated,...
You will be responsible for managing a diverse portfolio of projects across a live operational environment, including:
Company DescriptionAssystem is an international company with one mission: accelerate the energy transition around the world.Every day, our 7,500 switchers located in 12 countries (Europe, Middle East, Pacific Asia & Africa) connect their six thousand billion neurons to tackle the task of the century: switching to low-carbon energy.We are a collective committed to the actors who are making the...
Company Description: The UK’s nuclear sector has entered a renaissance, with Nuclear Energy now a vital component as the country moves towards a target of Net Zero. Assystem provides critical support to this mission, accelerating the decommissioning and remediation of our legacy assets with a view to enabling a swifter energy transition, in parallel overcoming some of the largest engineering...
Chief Engineer HMNB Clyde, Faslane G 7JU days on / off roster patter. Competitive salary plus benefits Serco Maritime Services deliver maritime support packages tailored to our customers’ needs all delivered within a national accreditation framework. As owners and operators of specialist vessels, from harbour workboats to oceangoing support vessels, we provide world class integrated maritime...
Role Title: Quantity SurveyorRole Type: Full-Time, Permanent Locations: Glasgow / Helensburgh - HybridSalary: £42,000 - £60,000 depending on experienceHours of work: Up to 40 hours per weekBenefits package available About the Nuclear FunctionThe nuclear division supports a wide range of programmes, from operational reactor work and new build projects to decommissioning and defence-related...
Location: HelensburghWorking arrangement: 3 days on site, 2 days at home Contract or staff options available The Assistant Project Manager has a key role in supporting the overall management and coordination of this capital infrastructure project. The Assistant Project Manager assists in strategic planning, risk management, and quality control throughout the project lifecycle. Effective...
About The Role Health and Safety Advisor - Edinburgh / East Scotland JOB TITLE: Health and Safety Advisor DIVISION: Building LOCATION: Helensburgh/North of Glasgow, UK CONTRACT TYPE: Permanent BENEFITS: 35 Days Annual leave (incl. bank hols), Pension Scheme, Life Assurance, Subsidised Healthcare Scheme. GRAHAM are looking to recruit an enthusiastic and dynamic individual with sound knowledge of...
You must be a UK National to be considered. VolkerStevin have recently adopted the Common Data Environment (CDE) Asite, and the role will support projects using this tool as well as those new projects with implementing the CDE. The candidate will provide efficient day-to-day information control for project data.
Job Description Join us a Electrical Engineer Contract/Staff Position Your Future Team: The Electrical Engineer will be working as part of a multi-disciplinary engineering team within the Approving Authority, the primary purpose of the role is to directly support current operations and future programmes. Supporting nuclear facilities & the delivery of services across both Client Sites near...
A global consultancy is seeking experienced Programme Directors to join its expanding team delivering major infrastructure programmes across sectors including civil infrastructure, data centres, defence, and energy. These specific permanent roles are available on a hybrid basis and will focus on huge infrastructure projects in the defence and nuclear sectors, working in partnership with clients...
Serco Maritime Services have a fantastic opening for a Chief Engineer to join our existing team at HMNB Clyde based in Faslane. The role of the Daywork Chief Engineer is to support the Tug Master(s) with all matters pertaining to engineering and electrical operation, maintenance and defect rectification providing maximum usage and time at operational readiness. Serco Maritime Services deliver...
Job Title: Fabrication Supervisor Location: Helensburgh, Argyll and Bute Compensation: Up to £52, depending on experience + Benefits Role Type: Full time / Permanent Role ID: SF At Babcock we’re working to create a safe and secure world, together, and if you join us, you can play your part as a Fabrication Supervisor at our HMNB Clyde Faslane site. The role As a Fabrication Supervisor,...
Part of the VolkerWessels UK Group, VolkerStevin is an industry-leading civil engineering business, providing complex and innovative engineering solutions across a wide range of sectors including maritime, flood risk management, defence, energy, water and regeneration. Collaborating with, and drawing on the specialist skills of the group's business units we deliver a truly integrated,...
You will be based at Glasgow or Faslane, with travel between Glasgow, Faslane, and Rosyth. Hybrid working patterns are available. Essential experience of the Health, Safety and Environmental Advisor: Previous experience as an HSE Advisor within a highly regulated environment.
You must be a UK National to be considered. VolkerStevin have recently adopted the Common Data Environment (CDE) Asite, and the role will support projects using this tool as well as those new projects with implementing the CDE. The candidate will provide efficient day-to-day information control for project data.