- Jobs
- United Kingdom
- London
- construction programme manager
construction programme manager jobs in London
Job Description Project Manager - Inside IR35 Key responsibilities - Responsible for the delivery of up to 3 new build housing projects (depending on size), through all RIBA stages, with a value per Project Manager, of between £20m and £50m, either by direct delivery or via a development partner. - Ensure that the projects for which you are responsible are delivered to cost (approved budget),...
Job Description Interim Project Manager – pre-construction Based in London Length: 6 months with possible extension IR35 status: Inside Rate: £450 per day via an umbrella company We are looking for someone who can manage the Councils pre-construction activities for capital programme projects, including those requiring Building Safety Regulator approval, planning consent, Section 20...
Job Description Pre-Construction Manager - Air Conditioning & Ventilation A well-established specialist Air Conditioning and ventilation contractor based in London is recruiting a Pre-Construction Manager to lead and coordinate all pre-contract activities, ensuring projects are accurately scoped, costed and prepared for seamless handover to project delivery teams. Key...
Job Description SITE Location: Wexham / Slough Construction Commencement: February - March 2026 Practical Completion December 2026 NB Currently in Design / Investigative Survey Stage Direct for Central London based Main D&B Contractor THE SCHEME High Quality D and B School refurbishment in two self-contained concrete buildings. – High level of structural alterations. Value £5M plus. SITE...
Job Description Mechanical Construction Manager High Wycombe£65,000 - £80,000 + Travel Allowance + Stay Away Included + Discretionary Bonus + Pension + Holidays + Private Medical Insurance + Full Package + Technical Progression + Immediate StartTake on the role of Mechanical Construction Manager with a rapidly growing main contractor operating within the thriving mission-critical construction...
Project Manager (Mechanical) - London Location: London Contract Length: 12 months+ Rate: DOE (Outside IR35) Working Arrangement: On site / office About the Role: g2 are seeking a Mechanical Project Manager to lead projects in London. Responsible for overseeing and managing all aspects of a number of different projects at one time. The role is a 12-month+ contract with the potential for...
You will be instrumental in the delivery of a complex, design-led development under a leading client, with direct accountability for technical quality and programme success. If you are a highly capable Construction Manager ready to take on this challenging and prestigious spa development, apply today.
We are currently working in partnership with a Housing Association, who are looking to appoint a Construction Quality Manager on a Permanent Contract. Do you have the following skills, experience and drive to succeed in this role Find out below. This will be a full-time position based in North London, with hybrid working and a salary of £55,000 per annum The ideal candidate will have...
Job Description Are you an experienced construction professional with a background in wastewater, or a background in another industry with transferable skills?Thames Water has an exciting opportunity for you!Are you an experienced construction professional—whether from wastewater or another industry with transferable skills? Thames Water is looking for a Construction Assurance Manager to lead on...
Construction Manager Location: London / South East (travel to London sites required)Full-time, PermanentCompetitive + Flexible Benefits Freedom’s Major Projects team has an exciting opportunity for a Construction Manager to take ownership of construction delivery for a major 132kV project, including substation and underground cable works. Some of the key deliverables in this role will...
You will have a commercial mindset with strong technical understanding and confidence to challenge the status quo.
You will have exposure to senior leadership, working closely with the Financial Controller and be part of a dynamic team of 8. You'll receive a competitive salary of £60,000-70,000 + bonus + competitive benefits.
Sales Manager - Construction Temporary Works - Scaffolding - London / South East Up to £70,000 + Monthly commission + Annual Bonus + Car or Car Allowance + Fuel card Our client is a leading provider of scaffolding solutions across construction temporary works, providing expertise for civil infrastructure, building, rail, power and utility projects across the UK and Europe. Based in London and...
Construction Manager Required - Join Our Client's Team in Shoreham Introduction We are seeking an experienced Construction Manager to take the lead on an exciting new self-storage build project in Shoreham. This is a contract role lasting six months, with a focus on civils and steel-frame construction. Our client is looking for a professional who can hit the ground running and ensure successful...
You will be instrumental in the delivery of a complex, design-led development under a leading client, with direct accountability for technical quality and programme success. If you are a highly capable Construction Manager ready to take on this challenging and prestigious spa development, apply today.
You will have a commercial mindset with strong technical understanding and confidence to challenge the status quo.
You will have exposure to senior leadership, working closely with the Financial Controller and be part of a dynamic team of 8. You’ll receive a competitive salary of £60,000–70,000 + bonus + competitive benefits.
Project Manager (Mechanical) - London While professional experience and qualifications are key for this role, make sure to check you have the preferable soft skills before applying if required. Location: London Contract Length: 12 months+ Rate: DOE (Outside IR35) Working Arrangement: On site / office About the Role: g2 are seeking a Mechanical Project Manager to lead projects in London....
Sales Manager Like the look of this opportunity Make sure to apply fast, as a high volume of applications is expected Scroll down to read the complete job description. - Construction Temporary Works - Scaffolding - London / South East Up to £70,000 Monthly commission Annual Bonus Car or Car Allowance Fuel card Our client is a leading provider of scaffolding solutions across construction...
Job Description Construction Quality Manager – Special Projects Are you an experienced construction professional with a passion for quality, safety and getting things right first time? This role offers the opportunity to take ownership of quality control across a range of remediation and special projects, ensuring works are delivered to the highest standards and that residents remain safe and...
Pre-Construction Manager - Air Conditioning & Ventilation A well-established specialist Air Conditioning and ventilation contractor based in London is recruiting a Pre-Construction Manager to lead and coordinate all pre-contract activities, ensuring projects are accurately scoped, costed and prepared for seamless handover to project delivery teams. Key Responsibilities Manage tendering activity:...
Job Description Pre-Construction Manager - Air Conditioning & Ventilation A well-established specialist Air Conditioning and ventilation contractor based in London is recruiting a Pre-Construction Manager to lead and coordinate all pre-contract activities, ensuring projects are accurately scoped, costed and prepared for seamless handover to project delivery teams. Key...